
Add to Cart
Custom Plastic Installation Base Home Appliance Mould OEM Color Green
Description
our commitment |
All customer-centric,never betray long-term benifits for short-term benfits. |
our scope of mould business |
Mold,GARAGE KIT,injection molding,product assembly, surface printing,surface spraying integration |
provide information as follow |
2D,3D,samples or pictures of multiple points of view with dimensions. |
mould production cycles |
15--60days, on basis of the difficulty level |
plastic products production cycles |
7--15days |
mould precision |
0.1mm |
service life |
500-1000 thousand times |
cavity number of mold |
Single cavity,Multiple cavity or one mold with different products |
mould material |
P20,2738,2344,718,S136,8407,NAK80,SKD61,H13 |
runner system |
Hot runner , Cold runner |
surface treatment |
Words corrosion,Mirror polish,Frosted surface,Dermatoglyph |
mould standard |
HASCO,DME or according to custom's request |
main process |
Milling,grinding,CNC,EDM,wire-electrode cutting, carved, electrospark,lathe,surface treatment |
design software |
CAD, PRO-E, UG etc. |
design time |
Within 3 days(generally) |
formed material |
ABS,PP,PC ,PA6,PA66, TPU,POM ,PBT,PVC,HIPS,PMMA, TPE,PC/ABS,TPV,TPO,TPR,EVA,HDPE. |
quality assurance |
ISO9001 |
factory profile |
6000 square meters,100 employees including 8 inspector |
Product Shipment
1 . Packaging : pack the parts into the transparent bag,and place the bags into the carton box one by one.
Common packaging: pack the parts into the transparent plastic bag
2 . Shipping method: By sea or by air according to customer's need.
3 . Loading port: Guangzhou Port or Shenzhen Port of the Guangdong Province.
4 . Shipping way: By air (3-6 days), or by sea (15-35 days).